SOLUTIONS / DATA CENTER & MINING

From Mining to
High-Density AI

Transition from Bitcoin mining to High Performance Computing (HPC). Secure low-cost off-grid power for the next generation of liquid-cooled ASIC and AI infrastructure.

Power Cost Arbitrage

Grid rates kill profitability. With commercial grid mining costs hitting ~$130k/BTC, off-grid natural gas generation is the only way to lock in low OPEX, survive halving cycles, and pivot infrastructure to AI.

Predictable OPEX Asset Reuse for AI

Hydro & Immersion Cooling

Supporting the heat density of Antminer S21 XP Hydro and AI servers. Liquid cooling enables operation in 50°C+ desert oilfields while keeping chips stable for overclocking or continuous training loads.

Dust/Sand Proof High Density Deployment

Connectivity Upgrade

Mining works on Starlink, but AI demands low latency. Our site selection now prioritizes fiber proximity or microwave links to enable real-time inference and high-speed model training data transfer.

Starlink for Mining Fiber for AI/HPC
Infrastructure Reuse

Gas → Power → Compute

The AI Infrastructure Play

The bear market for mining is the bull market for AI infrastructure. Your natural gas generators don't care if they are powering SHA-256 hashes or LLM training.

  • Flexible Strategy Start with mining to monetize gas immediately. Upgrade to Tier 3/4 containerized data centers for AI clients when fiber arrives.
Consult on AI Transformation