We're excited to announce that Edina, alongside our technology partner
MWM Gas Engines
, will be exhibiting at
Data Centre World London
– part of
Tech Show London
- on 4 – 5 March at ExCeL London.
As demand for AI, cloud, Edge, and high-density compute accelerates, UK data centres face a new reality: grid constraints, rising energy costs, connection delays stretching years ahead, and an urgent need for resilience.
At Stand C197, we'll be showcasing how distributed energy, high-efficiency MWM gas engines, backup power, energy resilience, and microgrid solutions are enabling operators to:
✅ Secure reliable, on-site capacity
✅ Reduce exposure to grid bottlenecks
✅ Take back control of their energy strategy
As a full-service EPC contractor, Edina delivers end-to-end turnkey distributed power solutions. From design and installation through to long-term asset care, we ensure maximum availability and optimal uptime of your critical infrastructure asset, from a single point of delivery.
If you're navigating the complexities of powering critical digital infrastructure, come and talk to us at Stand C197. Let's explore how on-site generation can support your growth, resilience, and sustainability goals.
#DataCentreWorld #TechShowLondon #DataCentres #EnergyResilience #Microgrid #BackupPower #EnergyTransition #CriticalPower