@SunstrumPaul @xkeya @BestStephenD @ABDanielleSmith And a $10B AI data center in

Rick Scobey
Rick Scobey
Verified Source
2026-02-17 1 min read
**Key Insight:** The $10B AI data center in Olds, Alberta is a massive investment that will require significant energy consumption.

@SunstrumPaul @xkeya @BestStephenD @ABDanielleSmith And a $10B AI data center in Olds, complete with its own natural gas processing plant to run the generators required for the power needs.

GasGx Editorial Insight

This source highlights a shift from checkbox compliance to verifiable data integrity in Alberta.

For gas-powered mining operators, reporting should reconcile SCADA telemetry, fuel usage, power output, and emissions factors with an auditable data trail.

Operational priority: keep reproducible calculation logic, immutable raw-data snapshots, and exception logs for corrected records before filing compliance reports.

Operational CTA

Recommended GasGx Navigation: Natural Gas

Based on the scraped content focus, this GasGx page best matches the current topic (Natural Gas). Open it to continue with related tools, rankings, products, or resources.

Natural Gas Mining Assistant
Original Source

Read full article on original site

Visit Website